Selected PROJECTS 



NUNDUK: SPA & RETREAT


Nunduk is an Off Grid luxury spa retreat using regenerative sustainabilty principles. The proposed land for this project is located on the southern shores of Lake Wellington in Gippsland, Victoria. The project will be a multifaceted development currently planned to be 6 star Greenstar, including using site specific geothermal assets for spas and associated agricultural activities as well generating it’s own power and water and taking care of its waste.


The site is significantly degraded from salt water entering the Gippsland Lakes system and the degradation is continuing rapidly. The development plans to use a touch lightly approach preserving significant and valuable habitat and regenerate some degraded areas to create land with improved ecological value. Lifted above the salt layer this land will bring back a broader diversity and vitality to the natural environment.


The Project Recieved Local Govenment Planning Approval July 2019 and has been subject of a Call-In By the Minister for Planning for Resolution of an appeal to VCAT by The WGCMA Water Catchement Management Autority and Approved by the Govenors In Coucil February 2021 



SELECTED PROJECTS


The Pavillion Sydney 2020


An Bang Health Hub 2020


Ninh Van Bay ECO reasort 2019

The Pavillion is NSW Govenment Competition to provide for an occupieable waterfront Pavillion and Open Space addition to the Barangaroo Precinct.

The design is a Collaboration between Alfano, Joseph  Paonessa + Gary Diermendjian

Forming Part of the 90 HA masterplan for the low carbon satelite oceanfront extension of the World Heritage Listed ancient City of  Hoi An, Vietnam  

A Zero Net Energy tourism Initiative, located on a secluded headland to the North of Nha Trang Vietnam. The site is 40 HA and inclides a 20 HA Perfume garden and 10 HA of regenerated Native Bird Habitiat   

Mutopia 2014


A deep future 2050 urban sustainable regeneration proposition incorporating the re establishement of Melbourne's pre colonial water ecologies through the Re"Visioning" of the Future of Melbourne's Port - and proposeing a Zero Net Carbon Offset Schenario for Melbourne CBD 


JAALFANO Principal Research Fellow / A Professor  / Infrastructure Enginnering UMIMELB

Westlake Hanoi 2018


Cond-Hotel & Reception Centre and Assoiated Residential Precinct 

Chim Lac    Hoi An  Vn    2020


120 HA Danange River - An Bang Beach Peninsula Regeneration and Urban Integration Plan Consistent with the UN Sustainibility  / Climate Change Goals forming part of the World Heritage Listed Ancient Hoi An City's Satelite Service & Civic

Centre  

STAGE 4 POA Auckland  2018


POAL Headquaters Office and assiciated AV stradler / Robot LAb and Maintenance Facility 


In collaboration with Plus Archtecture NZ


STAGE 1 POA Auckland  2020


POAL RORO Facility Public Park and associated Community Intitatives - substantial completion 2019


In collaboration with Plus Archtecture NZ

STAGE 1.1 POA Auckland  2020


POAL Public Art & Engagement Community Intitatives completion 2020


In collaboration with Plus Archtecture NZ

MIRRAT 2016 Melbourne International RoRo Terminal


Mirrat / Webb Dock West is "World Leadership" In sustainable development - Certified 6 star Green Star- ISCA rated terminal comprising 50% of the 350 HA POM Web Doc Facility and Wharf

2017 Banksia Award Nominated 


For Walenious Wilhelmson

Project Team J.A.Alfano Project Design Director in Collaboration with Plus Architecture Melbourne, Leighton, Hyder, Worley Parsons  

E gate 2011


Project developed for DOT to provide for Universal Acessibility to all areas of the Footscray Station completed 2009 


JAAlfano Principal  / DIrector BHA

FOOTSCRAY TRAIN STATION


A Multi agency State Goverment Commissioned Project to reclaim 26 HA of rail siding land abutting the West End of the City. The Project was Benchmarked as a ONEPLANET LIVING SUSTAINIBILITY intiative delivering a Net Zero Operational Enegry Community of 3500 families within a mixed use urban enclave. 


JAALFANO Principal,  B Grasselli Assocate for FKAUSTALIA

West Center Hanoi 2017


Precinct Masterplan 10 HA  & Mixed Use development incorporating major retail and bio remediation 

Keppeland TSQ Hanoi 2014-20



The Twin Towers Site is the final remaining center piece of the 250 Ha Euroland precinct in Western Hanoi. This Project is 250,000m2 of mixed use floor area within two 45 story towers on 12 Ha of site area The project is curently in construction documentation for commencement mid 2021 


 Partners / TSQ / IDT Vietnam / IDT Australia 

China Town Cultural Centre & Hotel 2015

A bold proposition to develop a 350m mixed use Tall Towerfor the Russel Street Gateway to Melbourne's Chinatown


JA Alfano Design Princpal for BuchanGroup


Petro Vietnam Hanoi 2012


2nd Prize International Competition Winner

450m Mixed Use Tall tower and Precinct

including 10 Ha Public Park


JAALFANO Principal Assoc DIr,  B Grasselli Assocate for FKAUSTALIA LERA, Lehr Consulting International, BarkerMahondas,

Terrapin Bright Green & AEcom

CLS KIngs Tower     2010


36 Story Mixed Use Tower Net Zero Operational Energy - Utilizing PV Facade and extensive Urban Wind Harvesting and other low carbon initiatives including -off site construction 


JAALFANO Principal Assoc DIr,  B Grasselli Assocate for FKAUSTALIA, Aurecon, Urbis, UNI Melb E & C 

ECO Green   Saigon   2018


The First Four Mixed Use Towers comprising 4500 residentaial units assocated with the 42 Ha Precinct redevelopment - construction subsatntially complete 2020 


In collaboration with Plus Archtecture Melbourne and Xing Mai JSC 

J A ALFANO Project Director https://eco-greensaigon.com

KEELUNG TIPC TAIWAN 2016


Commissioned by TIPC to prepare waterfront revitalisation plans for the Ports assets located at Keelung, Kaoshung and An Ping- Taiwan 


Mott MacDonald,  JA Alfano Design Princpal,  BuchanGroup

Re-A-Pier San Francisco 2020


Embarcadero Consortia Bid Pier 30-32 Port Of SF

60,000m2 Mixed Use Sustainable Precinct Re Visioning


Consortia Team P/A, MVRDV,PWA,ARUP, RLB 

MIRRAT Command Centre  2016 


Mirrat / Office Command and Control Center Customs House Integrated Fit Out - 6 star Green Star - NET Positive Annual Energy Usage 


For Walenious Wilhelmson

Project Team J.A.Alfano Project Design Director in Collaboration with Plus Architecture Melbourne Interior Design Brisbane , Leighton, Hyder, Worley Parsons, Sciavelo  

E GATE 2012


Melbourne Docklands Precicnt Masterplan and Urban Design Guidlines, Building Typology & Design Feasibility  Rezonning 



for Major projects Voctoria

JAALFANO Principal,  B Grasselli Assocate for FKAUSTALIA

Santa Helena Vitoria Brazil 2018

Limited Competition First Prize Contract Award 

50 Ha exisiting Shopping Centre Precinct Redevelopment 

Team Alfano + Grasselli, DG Projectos + John Haybal 

Mutopia Port Regeneration


Net Positve City Offset Plan  Biophilic /Bio Remediation Initative 2050




JAALFANO Principal Research Fellow / A Professor  / Infrastructure Enginnering UMIMELB

The Nevisian  2016- 2021


Nevisian is an environmentally sustainable luxury Hotel & Resort using regenerative sustainabilty principles. The proposed land for this project is located on the north eastern shores of the Island of Nevis part of the Leeward Islands chain situated where the northeastern Caribbean Sea meets the western Atlantic Ocean. The development was granted inital masterplan approval in 2016 with ongoing approvals pending. The development will be managed as part of the Wyndham Hotel Groups "Registry Collection Hotels & Resorts"


For Northern Pointe LLC  Project Team J.A.Alfano AIA Architect Project Design Director /  Danny Forester Interior Design / Branding  

House 5

Yandina QLD for Tanya Hoddiniott